good morning, I know that the pre-tensioning force of a bolt is managed in optistruct by applying a cut in the bolt and through the use of an independent SPoint the loads are transferred to the points of the bolt on which the pre-tensioning has been applied to simulate the screwing of the nut and therefore the shortening of the operating area of the bolt.
But I have a question. If I had to insert a negative pre-tensioning force, what would it mean?
Thanks