I want to see results at Load values 0.8P and 1.2P for comparison. I have a load value P.
My idea is to apply maximum load (1.2P) and provide specific time increment for 0.8P and 1P.
To save Running two diffrent files.
It is a non linear static analysis.
Can i use NLOUT (don't know specific settings) to see results at these specific load increments.