Hello everyone,
In a three-phase motor drive, three-phase current information is essential to perform Field Oriented Control (FOC).
A widely used approach to get them is the phase current reconstruction based on DC-link / bus current measurement.
In this approach the DC-link current is sampled in a scheduled way within a PWM period based on duty cycle width.
In my line of thought, the control algorithm can be implemented in a fixed discrete frequency and the DC-link current sampling instant should be adjustable.
I'd like to know if there is a way, or work around, to deal with this implementation in PSIM.
Regards,
Allan