Hi all,
I just completed a huge optimization (>30h), where optistruct ran into the limit of iterations (80). Unfortunately the final iteration violates the constraints by 140% (not clear why...). however, iteration 64 showed exactly what i'm looking for and was OK (3% violation) with all constraints.
Is there a way with OSSmooth to select a certain iteration to reanalyze?
if not, is there any other way how i can get to the results from that iteration (preferably) without running it again?
In case i set the number of iterations to 64, will i get exactly the same design?
thanks in advance,
regards
Michael