Datum Line Macro?
bjohnston
New Altair Community Member
Is there a way to easily plot the same handful of datum lines (at least 8) across several plots and pages, both now and in the future? I would like to be able to hit a button and have the datum's automatically configured and displayed as opposed to defining them each time I want to create another plot which is very time consuming.
Tagged:
0
Answers
-
I attached an example-TCL to add 3 Horizontal Datum Lines in the active window. Hope this helps.
Run with DropDown File > Run > Tcl/Tk Script
0