Hi
I have a very strange situation(in my opinion). I want to run a job with /DT/AMS with a reference time step 8 times to the conventional case. However my model is not able to run more than 2 times the reference time step. Assuming my reference time step as 0.5 micro second. I am trying to run AMS with a target time step of 4 microsecond which is like 8 times the nodal time step. However my model is running at max of 1 micro sec irrespective of the target time step. Pl suggest me a possible work around so that my simulation runs at the specified time step..