Community & Support
Learn
Marketplace
Discussions
Categories
Discussions
General
Platform
Academic
Partner
Regional
User Groups
Documentation
Events
Altair Exchange
Share or Download Projects
Resources
News & Instructions
Programs
YouTube
Employee Resources
This tab can be seen by employees only. Please do not share these resources externally.
Groups
Join a User Group
Support
Altair RISE
A program to recognize and reward our most engaged community members
Nominate Yourself Now!
Home
Discussions
Community Q&A
How to insert "missing examples"?
vwegert
Hello,
I'm looking for a way to generate "missing examples" into an example set. Basically, I have and example set with a date, a (polynomial) key and some numeric attribute that represents a measured value. In my process, I'm splitting this example set into partitions defined by the key (I'm using the Loop Values operator) and produce a Scatter plot for each value over time. While this works rather nicely, there's a slight problem left: Since the selection of stuff that is measured changes all the time, I don't get a consistent date range for every key value. For example, someone might decide that key = A is no longer worth measuring and turn it off, probably enabling key = B instead. This is not a problem for the process itself or the plot output, it all works as designed - but it's a problem for the user because the time axes of the resulting plots differ, sometimes wildly. Since the plots are shown directly beneath each other, the user will be tempted to compare the measurement data at a certain point in time, probably missing the fact that at the same (graphical) x position a different date value is plotted for every graph.
My question: What is the easiest way to ensure that all of the plots scale the time? I haven't been able to use the Scatter range list (of the Report operator) for this - maybe because I don't fully understand what the correct values for a date range might be. As an alternative, would it be possible to generate additional examples for the missing date/key combinations that have an empty numeric attribute and still have the Scatter plot display that date on its axis?
Thanks
Volker
Find more posts tagged with
AI Studio
Accepted answers
All comments
MartinLiebig
Hi Volker,
i am not a hundred percent sure. But can't you create an exampleset which has the correct axis, join that with yours and then fill the missings?
Best,
Martin
Quick Links
All Categories
Recent Discussions
Activity
Unanswered
日本語 (Japanese)
한국어(Korean)
Groups