Even during building roads your approach may be different from the standard one. The nature often forces engineers to use their creativity and go beyond typical projects. This leads to some unique, futuristic structures or some additional projects that have to be done and at the end are invisible. Our project of heavy lift barge contains in the second group. One part of this project was to proof that positioning system is sufficient to keep right position at the sea even during unfavorable weather conditions. For this purpose we perform numerous CFD analyses using AcuSolve. Computational cases differed in angle of flow, speed of flow and configuration of the barge. As a result of these all analyses defined working area of positioning system.