Hypermesh CFD, how to increase the runtime based on the last step?

bigshow
bigshow Altair Community Member
edited September 11 in Community Q&A

Hypermesh CFD, how to increase the running time based on the last step?

I have already run 800 steps and want to increase the running time, how to do it?

imageimage

Answers

  • acupro
    acupro
    Altair Employee
    edited September 6

    You would define your new running parameters - time step size, number of time steps or final time, etc - in the Flow Ribbon Setup/Physics panel, the same as you did for the initial run.

  • bigshow
    bigshow Altair Community Member
    edited September 11

    You would define your new running parameters - time step size, number of time steps or final time, etc - in the Flow Ribbon Setup/Physics panel, the same as you did for the initial run.

    Thank you so much.