Hi,
I had a question concerning the integration of an array from Excel (or for that matter, any type of data where it is a string of numbers) into a boundary condition loading in HyperMesh. I have two arrays of length 126; is there any way to apply them to each of my 126 selected nodes in my HyperMesh model (it is composed of 2-D shell elements)? I've attached a picture of a section of the arc if that helps. I am trying to divide up a normal load over an arc into horizontal and vertical forces efficiently and quickly. If anyone has any suggestions, that would be greatly appreciated. Thanks!
Dylan Stelzer
<?xml version="1.0" encoding="UTF-8"?>