Hi Everyone,
I'm running an optimisation with multiple load cases. The solution gets really close to converging (in the .OUT file) the first and second convergence criterion are met and just as its about to converge the solution diverges. It runs for the maximum number of iterations (80) before it stops. Is there any way to change how long the optimisation will for so that a solution is reached before the maximum number of iterations are reached?
Or does it more than likely suggest my load cases are incorrect, or theres something wrong with my model? etc.