Hi everyone,
I'm doing a nonlinear quasi-static analysis (NLSTAT) composed of two loadstep. Usually I make modification on BC applied to the 2nd loadstep. It is possible to restart this analysis from the second loadstep instaed of restarting the complete analysis?
thanks,
Luke31