Hi Experts,
I have an assembly which I meshed using tria Shell elements in Mesh Control panel(Mesh>>MeshControls). I have set some criteria for fillets/holes/ribs/faces before I start the meshing. After one iteration of run, depending on the results I make changes in the CAD. Now every time I have an updated CAD for next iteration, I have to create the mesh criteria before meshing. Then I mesh the new updated CAD, then replace it in my model using 'replace' option. Is there any way I can replace the CAD and it takes care that it meshes the replaced CAD using my meshing parameters set from Mesh Controls panel?