How to automate the process to input multiple load connectors in HM

Vidyaprakash G S
Vidyaprakash G S Altair Community Member
edited January 2023 in Community Q&A

Dear All,

We have to create more than 100 load collectors to solve transient case (uploading in excel format)in hypermesh Is there any macros or automation can be done to input all the load collectors. Pl.advise me for inputting the load collectors.

Prakash

 

Tagged:

Answers

  • Jason_Craanen
    Jason_Craanen
    Altair Employee
    edited January 2023

    In the Aerospace Ribbon there is an Instantiate tool in the Assembly toolbar

    image