An exclusive raffle opportunity for active members like you! Complete your profile, answer questions and get your first accepted badge to enter the raffle.
There is any way to start a simulation using other simulation result in motion-view.
For example the first simulation is a car starting the drive and accelerates and the second simulation is the same car but it starting in the middle of the first one.
Hello Maor
MotionSolve has an ability of Save and Load functionality, that may suit the above described requirement.
One can save the simulation configuration at a particular time interval using the <Save command.
Then in a different simulation that uses the same model, <Load_Model command can be used to start the simulation from the saved configuration
Regards
Praful