Output: "Total number of Auto-SPC d.o.f.s = 891600"
Hello,
In the outputfiles of my analyses something comes across I dont understand (first two attached pictures).
My supervisor recommmended to find out about that.
I assume that the Grid No. is the GRID and i read that the GRID is also the Node ID.
So when I check the Node ID I can't find any constraints (third picture attached).
Is this report message important? What is the solution if it is problematic?
<?xml version="1.0" encoding="UTF-8"?>
Answers
-
When you have AUTOSPC enabled, it's not you who make SPC, but the solver. So you see nothing.
Turn off AUTOSPC and check your BC.
0 -
I dont have AUTOSPC in the PARAM Set-Card enabled.
Also I only have one Boundary Condition (with 6 fixed dof) on a RBE3 element.
So I am still having the problem.
0